Country: Maldives
Location: Villingili Island
Status: Completed
Funded By: Islamic Development Bank (IsDB)
Issue
Villingili Island required the construction of two new harbors to improve transportation, fishing, and trade access. The project needed comprehensive design, tender preparation, environmental assessment, and construction supervision to ensure sustainability and protect marine life.

Initiative
Commissioned by the Maldives Housing and Urban Development Board and funded by the Islamic Development Bank, SAJDI, in association with Kuwait Consulting & Investment Co. (KCIC) and Niras Portconsult, delivered full consultancy services across three phases:
Stage I – Pre-Construction
- Review of existing data & site conditions.
- Topographic and hydrographic surveys.
- Preliminary & detailed design of two harbors.
- Preparation of tender documents and pre-qualification process.
- Tendering, evaluation, and contract negotiations.
Stage II – Construction
- Full-time supervision of harbor construction works.
- Quality control, contract administration, and preliminary handover.
Stage III – Maintenance
- Supervision of post-construction maintenance activities.
- Final handover to client.
A full Environmental Impact Assessment (EIA) was conducted to assess, mitigate, and monitor potential impacts on coral reefs and marine biodiversity.
Benefits
- Boosted marine transport efficiency and safety for Villingili Island.
- Strengthened fishing and trade opportunities.
- Implemented environmentally responsible harbor construction to protect sensitive marine ecosystems.
Specializations Used
- Port & Harbor Design.
- Geotechnical Investigation.
- Marine Environmental Assessment (EIA).
- Construction Supervision.
- Tender Document Preparation.