Status: Completed
Country: Malawi
Issue
Chileka Pumping Station and Walker’s Ferry Water Treatment Plant in Malawi required urgent rehabilitation and capacity upgrades. The existing infrastructure suffered from wear, limiting water supply reliability and treatment capacity for the growing population. Without intervention, water scarcity and quality issues threatened public health and development.

Initiative
Funded by the International Development Association (IDA), this project involved the comprehensive rehabilitation and renewal of the Chileka Pumping Station and capacity enhancement of Walker’s Ferry Water Treatment Plant, which treats 110,000 m³/day.
The scope included:
- Repair and construction of buildings including chemical and chlorination facilities.
- Repair and upgrade of reservoir buildings and pumping equipment at Chileka station.
- Installation of 8 new multi-stage pumps and related electrical systems, including transformers and control panels.
- Civil works including construction of pump plinths and transformer buildings.
- Upgrading piping, surge protection, and cathodic protection systems.
- Rehabilitation of pumping stations, pipes, tanks, clarifiers, and sand filters at Walker’s Ferry.
SAJDI’s Role
SAJDI provided design review and construction supervision to ensure quality execution, safety, and compliance with engineering standards throughout all rehabilitation works.
Benefits
- Improved water supply reliability and increased pumping capacity.
- Enhanced water treatment capacity to 110,000 m³/day.
- Extended lifespan of critical water infrastructure.
- Better public health outcomes through improved water quality.
- Support for sustainable water management in Malawi.
Specializations used:
- Design Review
- Construction Supervision
- Electrical, Mechanical, and Civil Engineering Coordination