Country: Syria
Status: Design Completed
Issue
The Raqqa–Deir Ezzor corridor in northeast Syria required a modern, high-capacity highway to improve regional connectivity, reduce travel time, and support economic growth in a strategic area.

Initiative
Commissioned by the Ministry of Communications, SAJDI, in association with KCIC, undertook the study, detailed design, and construction supervision of a 156 km two-lane highway with a total width of 13.5 m.
Key Design Features:
- Horizontal and vertical alignment optimization.
- Pavement design for long-term durability.
- Six major intersections and interchanges.
- Three bridges and tunnels.
- Multiple box and pipe culverts.
- Retaining walls for stability and erosion control.
Services Delivered by SAJDI:
- Review of previous feasibility studies.
- Environmental impact assessment.
- Economic and traffic studies.
- Hydrological analysis.
- Surveying and geotechnical investigations.
- Detailed engineering design.
- Construction supervision.
Benefits
- Enhanced transport efficiency between Raqqa and Deir Ezzor.
- Improved road safety and resilience to environmental challenges.
- Strengthened trade and economic activity in the northeast region.
Specializations Used
- Highway Engineering & Design.
- Transportation Planning & Traffic Analysis.
- Environmental & Hydrological Studies.
- Structural & Geotechnical Engineering.