Country: Lesotho
Location: Maseru
Status: Completed
Funded By: Arab Bank for Economic Development in Africa (BADEA)
Issue
Moshoeshoe I International Airport required expansion and modernization to meet growing passenger and cargo demands, improve safety systems, and upgrade operational facilities.

Initiative
Commissioned by the Department of Civil Aviation – Lesotho, SAJDI provided complete consultancy services, including study, detailed design, and construction supervision for the airport’s infrastructure diversification and expansion.
Scope of Work Included:
- Relocation and modification of DVOR/DME navigation system.
- Alteration of the existing passenger terminal and cargo building.
- Design and construction supervision for an additional administration building.
- Expansion of staff facilities with 38 new housing villas.
- Construction of a new watch tower and monitoring facility at the existing fire, crash, and rescue building.
- Extension and modification of the wastewater treatment plant.
- Installation of new perimeter fencing (metal chain link).
- Supply of miscellaneous furniture and coordination for airport service equipment installation.
Benefits
- Increased airport capacity and operational efficiency.
- Enhanced navigation and safety systems.
- Improved passenger, cargo, and administrative facilities.
- Upgraded emergency and rescue infrastructure.
Specializations Used
- Airport Infrastructure Design.
- Aviation Safety Systems.
- Structural, Mechanical & Electrical Engineering.
- Wastewater Treatment Design.
- Project & Construction Supervision.