Country: Lesotho
Location: Maseru
Status: Completed
Funded By: Arab Bank for Economic Development in Africa (BADEA)

Issue

Moshoeshoe I International Airport required expansion and modernization to meet growing passenger and cargo demands, improve safety systems, and upgrade operational facilities.

Moshoeshoe I International Airport expansion and infrastructure design in Lesotho by SAJDI.
Airport infrastructure diversification and design supervision in Lesotho – SAJDI.

Initiative

Commissioned by the Department of Civil Aviation – Lesotho, SAJDI provided complete consultancy services, including study, detailed design, and construction supervision for the airport’s infrastructure diversification and expansion.

Scope of Work Included:

  • Relocation and modification of DVOR/DME navigation system.
  • Alteration of the existing passenger terminal and cargo building.
  • Design and construction supervision for an additional administration building.
  • Expansion of staff facilities with 38 new housing villas.
  • Construction of a new watch tower and monitoring facility at the existing fire, crash, and rescue building.
  • Extension and modification of the wastewater treatment plant.
  • Installation of new perimeter fencing (metal chain link).
  • Supply of miscellaneous furniture and coordination for airport service equipment installation.

Benefits

  • Increased airport capacity and operational efficiency.
  • Enhanced navigation and safety systems.
  • Improved passenger, cargo, and administrative facilities.
  • Upgraded emergency and rescue infrastructure.

Specializations Used

  • Airport Infrastructure Design.
  • Aviation Safety Systems.
  • Structural, Mechanical & Electrical Engineering.
  • Wastewater Treatment Design.
  • Project & Construction Supervision.