Date: Completed
Country: Lesotho

Issue:
Maseru, the capital of Lesotho and home to more than 330,760 people, faced significant challenges with its water supply. The quality of life and health in the city were hindered by polluted and inaccessible water. This posed a critical need for an enhanced and reliable water supply system to support the city’s growing population and to improve overall living conditions.

Maseru Peri Urban Water Supply Project Done bt SAJDI
Maseru Peri Urban Water Supply Project Done bt SAJDI

Initiative:
In response to Maseru’s water supply issues, SAJDI undertook the Maseru Peri Urban Water Supply project. This project aimed to extend the existing water infrastructure to better serve the peri-urban areas of Maseru. Our team embraced the challenge of understanding a new culture to devise suitable engineering solutions, ensuring the project aligned with the local needs and conditions. The project’s scope included:

  • Detailed design and supervision of an 8 km Water Force Main using ductile iron pipes.
  • Expansion of secondary and tertiary distribution systems with 640 km of piping.
  • Installation and testing of HDPE pipes with necessary accessories to replace existing house connections.
  • Adding new connections to 6,800 homes.
  • Construction supervision for new and expanded reservoir capacities, including the new Lancer’s Gap Reservoir and expansions of three existing reservoirs.
  • Development of several new pumping stations.

Benefits:

  • Reliable and safe water supply for the peri-urban areas of Maseru.
  • Improved health and living conditions due to access to clean water.
  • Increased water storage capacities to support the growing population.
  • Efficient water distribution system with upgraded connections for homes.
  • Strengthened infrastructure with modern pumping facilities and reservoirs.       

Specializations used: 

  1. Detailed design.
  2. Construction supervision.