Status: Completed
Country: Jordan
Location: Karak City

Issue

The Karak–Qatraneh road suffered from poor alignment, defective pavement, and high accident rates due to inadequate geometry and outdated infrastructure. Heavy traffic volumes further highlighted the urgent need for a safer, more efficient highway.

Highway design and road improvement works for Karak–Qatraneh Highway in Jordan by SAJDI.
Upgrading Karak–Qatraneh Highway – A SAJDI project to enhance safety and connectivity in Jordan.

Initiative

Commissioned by the Ministry of Public Works & Housing (MPWH) and funded by the Government of Jordan, SAJDI carried out the feasibility study, detailed engineering design, and tender documentation for the 43 km Karak–Qatraneh Highway.

Key works included:

  • Geometric design improvements and traffic safety enhancements.
  • Design of interchanges, bridges, pipe culverts, retaining walls, and road finishes.
  • Preparation of complete tender documents for construction.

Benefits

  • Safer travel through improved highway alignment and pavement quality.
  • Increased road capacity to meet growing traffic demands.
  • Reduced accident rates and improved connectivity for Karak and surrounding regions.

Specializations Used

  • Feasibility Studies.
  • Detailed Highway Engineering Design.
  • Tender Documentation.