Status: Completed
Country: Jordan

Issue:
The Greater Amman area, with a population of 151,000 people, faced significant water supply challenges, including outdated infrastructure and an unreliable water distribution system. Residents experienced frequent shortages, and the existing pipelines and reservoirs were insufficient to meet the growing demand.

Initiative:
SAJDI undertook the detailed design and construction supervision of a comprehensive water supply improvement project to address these challenges. The key initiatives included: 

1. Designing and constructing 12.5 km of primary pipelines and 79 km of distribution pipelines in two zones using ductile iron pipes with diameters ranging from 80 to 1000 mm.
2. Building four reservoirs, each with a 4,000 m³ capacity, to ensure water storage for the growing population. 
3. Refurbishing an existing pumping station to improve water distribution efficiency and reliability.

Benefits:

  • Reliable water supply for 151,000 residents, ensuring access to clean and safe water.
  • Improved public health and living conditions, with water readily available for household and community use.
  • Modernized infrastructure that can support the current and future population, reducing the risk of water shortages.
  • Reduced strain on residents who previously struggled with inconsistent water availability, improving the overall quality of life. 
Greater Amman Project Done by SAJDI
Greater Amman Project Done by SAJDI

Specializations used:

  1. Detailed design and 
  2. construction supervision